← The Tri-Cities Wire
Infrastructure

I-405, I-5 Work Scheduled Through September

πŸ”Š Listen Β· narrated by Aiden

I-405 will see overnight closures from milepost 12 to Coal Creek Parkway Southeast on Thursday night, Sept. 3 through Friday morning, Sept. 4. I-5 will have single-lane reductions nightly near Alger/Lake Samish Road (exit 240) from Aug. 31 through Sept. 4, and northbound I-5 will have left lane closures nightly near North Lake Samish (exit 246) through Sept. 4.

WSDOT notes the I-5 fish passage construction projects will require alternating traffic on SR 20 from Swin Slough Bridge to Laconner Whitney Road/Bay View Road, with work continuing daily except weekends through further notice. SR 4 will have weekday closures between 50th and 42nd Avenues from 7:30 a.m. to 5 p.m. through Sept. 11.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts10 of 12 claims supported Β· 83%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    I-405 will see overnight closures from milepost 12 to Coal Creek Parkway Southeastβ€œ405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 – 5 a.m. Friday, Sept. 4.”
  • βœ“
    The overnight closures on I-405 will occur on Thursday night, Sept. 3 through Friday morning, Sept. 4β€œ405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 – 5 a.m. Friday, Sept. 4.”
  • βœ“
    I-5 will have single-lane reductions nightly near Alger/Lake Samish Road (exit 240)β€œ005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.”
  • βœ“
    The single-lane reductions on I-5 will last from Aug. 31 through Sept. 4β€œ005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.”
  • βœ“
    Northbound I-5 will have left lane closures nightly near North Lake Samish (exit 246)β€œ005: The left lane of northbound I-5 will close from 8 p.m. to 5 a.m. nightly Sunday, Aug. 30, through Friday morning, Sept. 4, north of North Lake Samish (exit 246) for fish passage construction.”
  • βœ“
    The left lane closures on northbound I-5 will last through Sept. 4β€œThe left lane of northbound I-5 will close from 8 p.m. to 5 a.m. nightly Sunday, Aug. 30, through Friday morning, Sept. 4, north of North Lake Samish (exit 246) for fish passage construction.”
  • ⚠
    WSDOT notes the I-5 fish passage construction projects will require alternating traffic on SR 20No usable supporting receipt β€” unverified.
  • βœ“
    The alternating traffic on SR 20 will be from Swin Slough Bridge to Laconner Whitney Road/Bay View Roadβ€œ020: Daily (except Saturday, Sunday) beginning Aug. 21 until further notice: State Route 20 traffic will alternate with flaggers from the Swin Slough Bridge (milepost 50) to Laconner Whitney Road/Bay View Road (milepost 53) for city Anacortes utilities work.”
  • ⚠
    The I-5 fish passage construction projects will continue daily except weekends through further noticeNo usable supporting receipt β€” unverified.
  • βœ“
    SR 4 will have weekday closures between 50th and 42nd Avenuesβ€œ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.”
  • βœ“
    The weekday closures on SR 4 will occur from 7:30 a.m. to 5 p.m.β€œ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.”
  • βœ“
    The weekday closures on SR 4 will last through Sept. 11β€œ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.”

The Tri-Cities Wire is free. Get Tri-Cities's news delivered every morning.