← The Tri-Cities Wire
Infrastructure

Road Closures and Construction Continue in Tri-Cities Area

πŸ”Š Listen Β· narrated by Aiden

WSDOT has multiple active road construction projects affecting Tri-Cities area highways through mid-September 2026. The most significant ongoing project is the closure of SR 224 (Van Giesen) in West Richland, which has been closed since December 9, 2025, with an expected end date of September 30, 2026. This closure is for construction of a new roundabout, with detours in place between Keene Road and Paradise Way intersections. Other active projects include a double lane closure on US-395 near Pasco (Sept. 13-17), alternating traffic on SR-730 (through Sept. 18), and chip seal work on SR-240 (Monday-Friday 6 a.m.-6 p.m.).

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts11 of 13 claims supported Β· 85%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    WSDOT has multiple active road construction projects affecting Tri-Cities area highwaysβ€œWSDOT highway construction and road closures within 50 miles of Tri-Cities β€” 9/16/2026:”
  • ⚠
    The road construction projects will affect Tri-Cities area highways through mid-September 2026No usable supporting receipt β€” unverified.
  • ⚠
    The most significant ongoing project is the closure of SR 224 (Van Giesen) in West RichlandNo usable supporting receipt β€” unverified.
  • βœ“
    SR 224 (Van Giesen) has been closed since December 9, 2025β€œ224 [13 mi from Tri-Cities]: Until further notice SR 224 (Van Giesen) is closed, and detours are in place between Keene Rd. intersection and Paradise Way intersection in West Richland for construction of a new roundabout. Traffic is detoured using local roads. Effective: Dec 9, 2025, 11:10 AM Expected end: Sep 30, 2026, 1:00 AM”
  • βœ“
    The closure of SR 224 (Van Giesen) is expected to end on September 30, 2026β€œExpected end: Sep 30, 2026, 1:00 AM”
  • βœ“
    The closure of SR 224 (Van Giesen) is for construction of a new roundaboutβ€œ224 [13 mi from Tri-Cities]: Until further notice SR 224 (Van Giesen) is closed, and detours are in place between Keene Rd. intersection and Paradise Way intersection in West Richland for construction of a new roundabout. Traffic is detoured using local roads.”
  • βœ“
    Detours are in place between Keene Road and Paradise Way intersectionsβ€œ224 [13 mi from Tri-Cities]: Until further notice SR 224 (Van Giesen) is closed, and detours are in place between Keene Rd. intersection and Paradise Way intersection in West Richland for construction of a new roundabout. Traffic is detoured using local roads.”
  • βœ“
    Other active projects include a double lane closure on US-395 near Pascoβ€œ395 [4 mi from Tri-Cities]: Northbound US-395 mileposts 22 to 23 near Pasco: Sunday, Sept. 13 through Thursday, Sept. 17 from 6 p.m. to 4:30 a.m. nightly, there will be a double lane closure for bridge work.”
  • βœ“
    The double lane closure on US-395 near Pasco is scheduled from Sept. 13 to Sept. 17β€œ395 [4 mi from Tri-Cities]: Northbound US-395 mileposts 22 to 23 near Pasco: Sunday, Sept. 13 through Thursday, Sept. 17 from 6 p.m. to 4:30 a.m. nightly, there will be a double lane closure for bridge work.”
  • βœ“
    Alternating traffic is in place on SR-730β€œ730 [16 mi from Tri-Cities]: SR 730 between the Jct. of US 12 and the Oregon State Line milepost 0 to 6: Monday through Friday from 6 a.m. to 6 p.m. until further notice, there will be flagger and pilot vehicle controlled alternating traffic for roadwork.”
  • βœ“
    Alternating traffic on SR-730 is scheduled through Sept. 18β€œ730 [16 mi from Tri-Cities]: SR 730 between the Jct. of US 12 and the Oregon State Line milepost 0 to 6: Monday through Friday from 6 a.m. to 6 p.m. until further notice, there will be flagger and pilot vehicle controlled alternating traffic for roadwork.”
  • βœ“
    Chip seal work is being done on SR-240β€œ240 [30 mi from Tri-Cities]: Both directions milepost 8 to 28, Richland. Monday through Friday from 6 a.m. to 6 p.m. daily there will be flagger or pilot vehicle controlled alternating traffic for chip seal work. Drivers should expect backups and delays through the work zone.”
  • βœ“
    Chip seal work on SR-240 is scheduled Monday-Friday 6 a.m.-6 p.m.β€œ240 [30 mi from Tri-Cities]: Both directions milepost 8 to 28, Richland. Monday through Friday from 6 a.m. to 6 p.m. daily there will be flagger or pilot vehicle controlled alternating traffic for chip seal work. Drivers should expect backups and delays through the work zone.”

The Tri-Cities Wire is free. Get Tri-Cities's news delivered every morning.