Roundabout construction on SR 224 between the Ruppert Road intersection, near milepost 6.08, and milepost 7.13 has been in effect since Dec. 9, 2025, according to WSDOT.
Traffic runs one way at a time behind a pilot car, with an 11-foot width restriction in place 24/7. The north side of Grosscup Avenue is closed with a local detour. WSDOT listed an expected end of Sept. 30, 2026.