← The Tri-Cities Wire
Infrastructure

US 12 Bridge Repairs Close Lane Over I-5

πŸ”Š Listen Β· narrated by Aiden

US 12 will close a single lane over I-5 nightly from 7:30 p.m. Monday, Aug. 10, through 6 a.m. Thursday, Aug. 20, for bridge repairs. Travelers must follow a detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12. The closure affects drivers crossing the I-5 corridor during evening and overnight hours. WSDOT warns of delays and urges drivers to slow down and stay focused. The project is part of ongoing maintenance to ensure the safety and functionality of the bridge structure. The lane closure is scheduled to end on Aug. 20, 2026, at 6 a.m. WSDOT will provide updates on the project webpage if changes occur.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 11 claims supported Β· 45%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    US 12 will close a single lane over I-5 nightlyβ€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    The closure starts on Monday, Aug. 10β€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • ⚠
    The closure ends on Thursday, Aug. 20No usable supporting receipt β€” unverified.
  • βœ“
    Travelers must follow a detour using northbound I-5 to Exit 71 for SR 508β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • ⚠
    Travelers must follow a detour using southbound I-5 back to US 12No usable supporting receipt β€” unverified.
  • ⚠
    The closure affects drivers crossing the I-5 corridor during evening and overnight hoursNo usable supporting receipt β€” unverified.
  • βœ“
    WSDOT warns of delaysβ€œSlow down, stay focused and expect delays.”
  • βœ“
    WSDOT urges drivers to slow down and stay focusedβ€œSlow down, stay focused and expect delays.”
  • ⚠
    The project is part of ongoing maintenance to ensure the safety and functionality of the bridge structureNo usable supporting receipt β€” unverified.
  • ⚠
    The lane closure is scheduled to end on Aug. 20, 2026, at 6 a.m.No usable supporting receipt β€” unverified.
  • ⚠
    WSDOT will provide updates on the project webpage if changes occurNo usable supporting receipt β€” unverified.

The Tri-Cities Wire is free. Get Tri-Cities's news delivered every morning.